Rangal Pipe Installation

Supply, procurement of 8km of DN400 PE100 PN12.5 HDPE pipe , valves and pits followed with the construction involving excavation, trenching, backfilling, poly welding and installation.

McCosker provided statutory approvals  and permits that incorporated underboring of the pipeline beneath both the Blackwater Road and existing rail line infrastructure, including trench­ less construction and enveloper installation construction methods. All testing, commissioning and handover activities for the Bedford West Pipe­ line Rangal Pipe replacement and connection to existing DN355 HDPE from Rangal Pump Station to Scour Valve No.10 to complete BHP water infrastructure upgrades.

ClientBHP Billiton Mitsubishi Alliance (BMA)
LocationBlackwater, Queensland
IndustryEnergy
Duration
Value$3.2 million